
Three kilometres from a new India.
Every minute matters when you live beside an international airport. Mangalam Aero Vista sits exactly where connectivity, infrastructure and value converge.
Three kilometres from a new world.
Village Navagam sits at the aviation gateway of India's boldest urban blueprint — the Dholera Special Investment Region, the first greenfield smart city in the country. Airport, expressway, MRTS, freight line and solar park all converge within minutes.

- 3 kmDholera International Airport (1,428 ha · two runways)
- Adj.Upcoming Dholera Aero City
- 10 minFirst Diamond Circle
- 15 minTata Semiconductor Fab & ReNew Power
- 20 minDholera SIR Activation Area (22.54 Sq. Km)
- 75 minAhmedabad via 6-Lane Expressway
The smart-city spine, right at the doorstep.
MRTS, LTR, BRT, regional bus & rail, cycle and pedestrian integration.
Dedicated freight corridor connecting Dholera to the DFC.
Ahmedabad ↔ Dholera on a dedicated right-of-way.
1,428 ha with 2,900 m & 4,000 m runways — 3 km from your gate.
Access-controlled — Ahmedabad reached in 75 minutes.
11,000 ha park in CRZ-1B powers the smart-city grid.
The Dholera number sheet, at a glance.
India's flagship greenfield smart-city investment, phased across two decades.
Roughly twice the size of Ahmedabad — designed from a blank canvas.
One of the world's largest solar installations powers the smart-city grid.
Phase-1 town-planning zone already trunk-serviced with utilities.
India's first commercial fab under construction inside the SIR.
7-stop dedicated metro on its own right-of-way.
Dholera International Airport spans 1,428 hectares with two runways (2,900 m and 4,000 m). Aero Vista sits three kilometres from the perimeter — closer than any residential township on record.
The Bhimnath–Dholera dedicated freight line plugs the SIR into the Delhi–Mumbai Industrial Corridor. Cargo from Dholera reaches JNPT and Mundra by dedicated rail.
A 6-lane access-controlled expressway compresses the Ahmedabad drive to 75 minutes; the MRTS metro will bring it to 60 minutes on a dedicated line.
Tata Semiconductor Fab and ReNew Power are already breaking ground within a 15-minute radius, seeding an entire employment ecosystem.
Minutes to everywhere that matters.
Times are indicative and improve with each infrastructure milestone — expressway, MRTS metro and airport phase-1.
- 3 kmDholera International Airport perimeter
- AdjacentUpcoming Dholera Aero City
- 10 minFirst Diamond Circle — SIR ceremonial gateway
- 15 minTata Semiconductor Fab & ReNew Power sites
- 20 minDholera SIR Activation Area (22.54 km²)
- 25 minBhimnath–Dholera Freight Corridor junction
- 40 minBhavnagar Port road connection
- 75 minAhmedabad city (via 6-Lane Expressway)
- 60 minAhmedabad (via MRTS metro, on commissioning)
- 90 minGandhinagar & GIFT City
